Introduction to the construction method of garbage incineration plant in "Ice and Steam Age 2"

Sep 24 2024

1 READS

The garbage incineration plant in "Frost Age 2" is a special factory in the game, but many players don't know how to build a garbage incineration plant. In fact, if you want to build this factory, you only need to meet the conditions and material requirements, that is The initial conditions are more troublesome. It is a red annex building. How to build a waste incineration plant in Ice Age 2? To build a waste incineration plant, you only need to meet the conditions and material requirements. The prerequisite is that the factory is a red annex building and it must be placed in a red industrial zone. There is a building location in the industrial zone, and another one will be given when expanding. Once you have the location, you can just build it. The materials

The garbage incineration plant in "Frost Age 2" is a special factory in the game, but many players don't know how to build a garbage incineration plant. In fact, if you want to build this factory, you only need to meet the conditions and material requirements. Yes, but the early conditions are more troublesome. It is a red auxiliary building.

How to build a garbage incineration plant in Ice Age 2

The construction of a waste incineration plant only needs to meet the conditions and material requirements. Its prerequisite is that the factory is a red annex building and it must be placed in a red industrial zone.

There is a building location in the industrial zone, and another one will be given when expanding. Once you have the location, you can build it directly. The materials are directly stated, just press and collect the materials.

Related Articles